CONSTRUCTION OF DRAINAGE AND CULVERT AT JOBELE, AFIJIO LOCAL GOVERNMENT AREA, OYO STATE | ERGP20157628 | 3,000,000.00 | | | | | | | |
FLOOD AND EROSION CONTROL IN ABOTO-ALFA, ASA LGA, KWARA STATE | ERGP20157631 | 10,000,000.00 | | | | | | | |
GULLY EROSION CONTROL WORKS BEHIND FCDA QUARTERS SIDE II JERE STREET GARKI II ABUJA | ERGP20158086 | 30,000,000.00 | | | | | | | |
EROSION CONTROL WORKS IN OGOBIA AND ILABA, UGBOJU VILLAGE, OTUKPO LGA, BENUE STATE | ERGP20158113 | 30,000,000.00 | | | | | | | |
FOREST CARBON INVENTORY FOR FREL UPDATE TO PROVIDE AN UPDATED INFORMATION ON VARIOUS AREAS OF ACTIVITIES ETC NOT INCLUDED IN NIGERIANS SUBMISSION TO UNFCC | | 20,000,000.00 | | | | | | | |
EROSION AND FLOOD CONTROL/ROAD IMPROVEMENT WORKS AT MEMUNAT ABEJE CRESCENT UNDER G OGBOMOSHO, OYO STATE | ERGP20158375 | 5,000,000.00 | | | | | | | |
COMPLETION OF EROSION AND FLOOD CONTROL WORKS IN GUMEL, GUMEL LGA JIGAWA STATE | ERGP20159069 | 15,400,000.00 | | | | | | | |
EROSION CONTROL DRAINAGE PROJECTS AT OMUNWEI, IGWURUTA IN IKWERRE LGA IN RIVER STATE | ERGP20159211 | 40,999,999.00 | | | | | | | |
CONSTRUCTION OF DOUBLE-CELL CULVERT AND DRAINAGE CONTROL AT YALA LGA, CROSS RIVER NORTH, CROSS RIVER STATE | ERGP20159235 | 30,000,000.00 | | | | | | | |
EROSION AND FLOOD CONTROL WORKS AT OBANTOKO GBONOGUN ODO ERAN, OGUN STATE | ERGP20159762 | 85,000,000.00 | | | | | | | |
OWU OGBE-TOTORO ROADEROSION CONTROL AND IBARA IJEJA SOKORI CHANNELISATION WORKS, ABEOKUTA, OGUN STATE | ERGP20159763 | 150,000,000.00 | | | | | | | |
FOREST CARBON INVENTARY FOR FREL UPDATE | ERGP20159770 | 8,000,000.00 | | | | | | | |
EROSION CONTROL AND ROAD REHABILITATION WORKS ALONG JEGERE KATAKO-KASURU ROAD, BASSA LGA, PLATEAU STATE | ERGP20159861 | 65,000,000.00 | | | | | | | |
EZIUDO-ISIOGUGU - EZIOGWE- OYI-OMELAKA - OKAMMILI EZIMBAINO EROSION CONTROL IN NTEJE, OYI LGA ANAMBRA STATE. | ERGP20159903 | 20,000,000.00 | | | | | | | |
EROSION CONTROL, REPAIRS OF FLOODING RAINSTORM AND DAMAGES IN DANMARKE KANKARA KATSINA STATE | ERGP20160086 | 40,000,000.00 | | | | | | | |
IYANA IYESI, ADO ODO OTA GRA EROSION CONTROL IN OTA, OGUN STATE | ERGP20160286 | 5,000,000.00 | | | | | | | |
FLOOD CONTROL AND SLUM UPGRADING/ROAD IMPROVEMENT WADATA STREET, NAHARATI SABO AREA, ASHARA ABATTOIR AREA, ABAJI AREA COUNCIL, FCT ABUJA | ERGP20161174 | 55,000,000.00 | | | | | | | |
EROSION AND FLOOD CONTROL/ROAD IMPROVEMENT WORKS AT ONUSOROGU-ENU ATTA-UKWU ACHARA/EBE-KPATA NYE ONU-OBIOFO- UMUAKASI UMUNGWU IN NNEWI SOUTH LGA, ANAMBRA STATE | ERGP20161175 | 5,000,000.00 | | | | | | | |
FLOOD CONTROL WORKS AND STORMWATER CHANNELISATION AT MAGAJIYA/AWALA IN RIJAU, RIJAU LGA AND AUNA STORMWATER CHANNELISATION/KAINJI ROAD IMPROVEMENT WORKS, MAGAMA LGA, NIGER STATE | ERGP20161176 | 10,000,000.00 | | | | | | | |
EROSION CONTROL WORKS AT EEMADO TUNTUN AIYETORO YELWA LGA, OGUN STATE | ERGP20161212 | 20,000,000.00 | | | | | | | |
EROSION AND FLOOD CONTROL WORKS AT AGBADANI/OBEAGU/ADAMA NRI GENERAL HOSPITAL, ENUGU UKWU ROAD, ANAOCHA LGA, ANAMBRA STATE | ERGP20161213 | 35,000,000.00 | | | | | | | |
ESTABLISHMENT OF RICE HUSK, BRIQUETTE PLANT WITH STOVE IN ( NORTH CENTRAL) | ERGP21104193 | 16,000,000.00 | | | | | | | |
SUSTAINABLE MANAGEMENT OF SELECTED CRITICAL WETLAND (2 RAMSAR SITES) | ERGP21104198 | 30,562,500.00 | | | | | | | |
PROCUREMENT AND INSTALLATION OF ANALYSERS AT ICC IN AIR MONITORING STATIONS | ERGP21125704 | 20,058,947.00 | | | | | | | |
STRATEGIC FRAME-WORK FOR THE DEVELOPMENT OF NATIONAL ACTION PLAN ON CLEANER PRODUCTION | ERGP21125786 | 7,000,000.00 | | | | | | | |
COMMUNITY-BASED WASTE MANAGEMENT PROJECT IN SOUTH-SOUTH, DELTA STATE | ERGP21125793 | 30,000,000.00 | | | | | | | |
COMMUNITY-BASED WASTE MANAGEMENT PROJECT WITH BACKLOG/CONTINUOUS EVACUATION OF SOLID WASTE (PLASTIC WASTE, USED TYPES, AGRICULTURAL WASTE ETC) WITH RECYCLING OPTIONS IN THE MOST FLOODED AREAS BENUE, KEBBI, BORNO, ONDO, ANAMBRA, BAYELSA DELTA, LAGOS AND EDO STATE | ERGP21132103 | 30,000,000.00 | | | | | | | |
COMMUNITY-BASED SOLID WASTE MANAGEMENT PROJECT IN NORTH WEST | ERGP21139834 | 80,000,000.00 | | | | | | | |
CONVERSION OF CASSAVA PEEL WASTE INTO ANIMAL FEED USING LOCALLY DEVELOPED TECHNOLOGY/EQUIPMENT AND ITS PROMOTION | ERGP21139866 | 30,000,000.00 | | | | | | | |
PILOT PROJECT WATER POLLUTION MANAGEMENT (CONVERSION OF WATER HYACINTH TO ORGANIC MANURE) | ERGP21153387 | 19,000,000.00 | | | | | | | |
CLIMATE SMART MUNICIPAL SOLID WASTE MANAGEMENT INTERVENTION MANAGEMENT | ERGP21153388 | 10,000,000.00 | | | | | | | |
"CLEAN AND GREEN PROGRAMME. A-ANNUAL COMMEMORATION OF NATIONAL ENVIRONMENT SANITATION DAY (28TH JUNE). B- ANNUAL COMMEMORATION OF WORLD TOILET DAY (19TH NOV.) C-GLOBAL HAND WASHING DAY COMMEMORATION (15TH OCT.)" | ERGP21153392 | 12,000,000.00 | | | | | | | |
RE-EVALUATION OF REMEDIATED LEAD CONTAMINATED SITE IN BAGEGA | ERGP21153393 | 9,000,000.00 | | | | | | | |
YOUTH AND WOMEN EMPOWERMENT THROUGH ENVIRONMENTAL MANAGEMENT OF WASTE FOR THE MOST VULNERABLE GROUP IN THE SOCIETY | ERGP21153395 | 10,000,000.00 | | | | | | | |
AIR POLLUTION PROFILE STUDIES OF CEMENT INDUSTRIES IN KOGI STATE | ERGP21153397 | 6,000,000.00 | | | | | | | |
YOUTH AND WOMEN EMPOWERMENT THROUGH ENVIRONMENTAL MANAGEMENT OF WASTE FOR THE MOST VULNERABLE GROUP IN THE SOCIETY | ERGP21153398 | 20,000,000.00 | | | | | | | |
YOUTH AND WOMEN EMPOWERMENT THROUGH ENVIRONMENTAL MANAGEMENT OF WASTE FOR THE MOST VULNERABLE GROUP IN THE SOCIETY | ERGP21153402 | 30,000,000.00 | | | | | | | |
YOUTH AND WOMEN EMPOWERMENT THROUGH ENVIRONMENTAL MANAGEMENT OF WASTE FOR THE MOST VULNERABLE GROUP IN THE SOCIETY | ERGP21153404 | 30,643,500.00 | | | | | | | |
COMPLETION OF WASTE RECYCLING FACILITY | ERGP21153406 | 15,000,000.00 | | | | | | | |
COMMUNITY WASTE BASED MANAGEMENT PROJECT IN NORTH CENTRAL | ERGP21153407 | 80,576,500.00 | | | | | | | |
COVID-19 MEDICAL WASTE MANAGEMENT | ERGP21153409 | 50,000,000.00 | | | | | | | |
YOUTH AND WOMEN EMPOWERMENT THROUGH ENVIRONMENTAL MANAGEMENT OF WASTE FOR THE MOST VULNERABLE GROUP IN THE SOCIETY | ERGP21153411 | 15,000,000.00 | | | | | | | |
COMMUNITY BASED SOLID WASTE MANAGEMENT IN ADAMAWA NORTH EAST | ERGP21153412 | 30,000,000.00 | | | | | | | |
YOUTH AND WOMEN EMPOWERMENT THROUGH ENVIRONMENTAL MANAGEMENT OF WASTE FOR THE MOST VULNERABLE GROUP IN THE SOCIETY | ERGP21153414 | 10,000,000.00 | | | | | | | |
COMMUNITY BASED SOLID WASTE MANAGEMENT | ERGP21153415 | 45,000,000.00 | | | | | | | |
TURNKEY PROJECT FOR THE ESTABLISHMENT OF A COMPREHENSIVE WASTE MANAGEMENT SYSTEM FOR THE PRODUCTION OF BIOGAS FROM URINE/BIODEGRADABLE WASTE USING THE TICLOB LUMOS METHOD FOR GENERATION OF ELECTRICITY AND COOKING IN PRISONS NATIONWIDE | ERGP21153417 | 0.00 | | | | | | | |
PROVISION OF SOLAR POWER STREET LIGHT AT SHARE-LAFIAGI ROAD AND SELECTED STREETS IN SHARE COMMUNITY, IFELODUN LGA, KWARA STATE | ERGP21153626 | 80,000,000.00 | | | | | | | |
UPGRADING OF COMMUNITY-BASED WASTE MANAGEMENT, GOMBE STATE | ERGP21154138 | 40,000,000.00 | | | | | | | |
AMULE EROSION CONTROL IN KWARA STATE | ERGP21154182 | 30,000,000.00 | | | | | | | |
CONSTRUCTION OF BRIDGE ACROSS RIVER RIMA FROM BUBUCE TO AUGIE LGA KEBBI NORTH SENATORIAL DISTRICT, KEBBI STATE | ERGP3160323 | 150,000,000.00 | | | | | | | |
COMPLETION OF ONGOING EROSION CONTROL AT URU UMUDIM IN NNEWI NORTH L.G.A | ERGP19160578 | 150,000,000.00 | | | | | | | |
COMPLETION OF ONGOING EROSION PROJECT AT ENUGWU AJAICHI IN ESWUSIBGO L.G.A | ERGP19160575 | 150,000,000.00 | | | | | | | |
EROSION AND FLOOD CONTROL WORKS IN AUYO, GURI AND KIRI- KASAMMA LGAs, JIGAWA NORTH EAST SENATORIAL DISTRICT, JIGAWA STATE | ERGP554004423 | 100,000,000.00 | | | | | | | |
EROSION & FLOOD CONTROL WORKS @ 30M EACH IN RIGASA, IGABI LGA & KAWO, KADUNA NORTH LGA, KADUNA CENTRAL SENATORIAL DISTRICT, KADUNA STATE | ERGP554004430 | 60,000,000.00 | | | | | | | |
EROSION & FLOOD CONTROL WORKS IN BELA TOWN, BUNGUDU LGA, ZAMFARA CENTRAL SENATORIAL DISTRICT, ZAMFARA STATE | ERGP554004447 | 50,000,000.00 | | | | | | | |
EROSION & FLOOD CONTROL WORKS IN EKITI NORTH SENATORIAL DISTRICT, EKITI STATE | ERGP554004569 | 60,000,000.00 | | | | | | | |
NEKE AFOR OGHE NDU ROAD EROSION CONTROL PROJECT, EZEAGU LGA, ENUGU WEST SENATORIAL DISTRICT, ENUGU STATE | ERGP554004586 | 50,000,000.00 | | | | | | | |
UMUEZE AMANKPUNATOR AMAEKWURU ISIKWE EROSION CONTROL PROJECT, OJI RIVER LGA, ENUGU WEST SENATORIAL DISTRICT, ENUGU STATE | ERGP554004587 | 50,000,000.00 | | | | | | | |
OKPATU TOURIST HILLS EROSION CONTROL PROJECT, UDI LGA, ENUGU STATE | ERGP554004588 | 100,000,000.00 | | | | | | | |
EROSION & FLOOD CONTROL WORKS IN IDEATO/OGBOKO, IMO WEST SENATORIAL DISTRICT, IMO STATE | ERGP554004599 | 200,000,000.00 | | | | | | | |
EROSION & FLOOD CONTROL WORKS IN IMO NORTH SENATORIAL DISTRICT, IMO STATE | ERGP554004600 | 200,000,000.00 | | | | | | | |
CONSTRUCTION/REHABILITATION OF ROADS, DRAINAGE AND EROSION CONTROL IN NNAMDI CHINYELU/EDWIN STREET IN NORMU VILLAGE IN ENUGU AGIDI TOWN IN NJIKOKA LGA OF ANAMBRA STATE | ERGP554003737 | 10,000,000.00 | | | | | | | |
COMPLETION OF ONGOING EROSION PROJECT AT ENUGWU AJAICHI IN ESWUSIBGO LGA | ERGP554001746 | 50,000,000.00 | | | | | | | |
COMPLETION OF ONGOING EROSION CONTROL AT URU UMUDIM IN NNEWI NORTH LGA | ERGP554001747 | 50,000,000.00 | | | | | | | |
COMPLETION OF MBANAGU EROSION CONTROL AT OTOLO NNEWI | ERGP554001748 | 50,000,000.00 | | | | | | | |
REMEDIATION OF ECOLOGICAL PROBLEMS IN OGU TOWN, OGU/BOLO LGA, RIVERS STATE. | ERGP554003572 | 200,000,000.00 | | | | | | | |
DESIGN/CONSULTANCY FOR EROSION CONTROL AND CONSTRUCTION OF CULVERT AT IGBAMITORO AREA, IJERO EKITI, IJERO LGA, EKITI STATE | ERGP554006573 | 3,000,000.00 | | | | | | | |
CONSULTANCY /DESIGN AND SITE EVALUATION FOR EROSION CONTROL AT IBAM EDET, ODORO IKPE | ERGP554006574 | 5,000,000.00 | | | | | | | |
EROSION CONTROL AT KATSINA LGA, KATSINA STATE | ERGP554006575 | 10,000,000.00 | | | | | | | |
EROSION CONTROL AND ROAD IMPROVEMENT WORKS AT UMUNOHO/NKWO ABO OLOBO ROAD IN EBIKORO UZOAGBA IKEDURE LGA, IMO STATE | ERGP554006576 | 20,000,000.00 | | | | | | | |
FUMIGATION, CLEARANCE AND DECONTAMINATION OF SELECTED PUBLIC BUILDINGS IN YOBE SOUTH SENATORIAL DISRICT | ERGP554006577 | 10,000,000.00 | | | | | | | |
ENVIRONMENTAL AWARENESS CAMPAIGN AND TREE PLANTING EXERCISE AT JIGAWA NORTH SENATORIAL DISTRICT OF JIGAWA STATE | ERGP554006578 | 15,000,000.00 | | | | | | | |
ENVIRONMENTAL SANITATION AND FUMIGATION EQUIPMENT AND TRAINING OF LGA SANITATION CORPS IN JIGAWA NORTH NORTH EAST SENATORIAL DISTRICT | ERGP554006579 | 20,000,000.00 | | | | | | | |
SENSITIZATION/AWARENESS CAMPAIGN ON PREVENTION OF EROSION, ENVIRONMENTAL SAFETY AND HAZARDS TRAINING AND ENVIRONMENTAL SANITATION EQUIPMENT AT EBONYI SOUTH SENATORIAL DISTRICT | ERGP554006580 | 10,000,000.00 | | | | | | | |
SENSITIZATION/AWARENESS CAMPAIGN ON PREVENTION OF EROSION, ENVIRONMENTAL SAFETY AND HAZARDS TRAINING AND ENVIRONMENTAL SANITATION EQUIPMENT AT AKWA IBOM STATE. | ERGP554006581 | 10,000,000.00 | | | | | | | |
DRAINAGE AND CONCRETE WALKWAY/PAVEMENT AT BASSAMBIRI IN NEMBE LGA, BAYELSA STATE. | ERGP554006582 | 10,000,000.00 | | | | | | | |
EROSION CONTROL AT AMUKWU OKPATU ENUGU WEST SENATORIAL DISTRICT, UDI LGA | ERGP554006583 | 70,000,000.00 | | | | | | | |
PROVISION AND INSTALLATION OF 3 IN 1 SOLAR LIGHTS IN ISIOKWE IVITE AGULERI IN ANAMBRA EAST LGA | ERGP554006584 | 30,000,000.00 | | | | | | | |
DRILLING AND REHABILITATION OF BOREHOLES IN TARABA COMMUNITY | ERGP554006585 | 8,000,000.00 | | | | | | | |
CHANELISATION AND EROSION CONTROL IN IDO/OSI MOBA ILEJEME FEDERAL CONSTITUENCY | ERGP554006586 | 8,000,000.00 | | | | | | | |
PROVISION OF INCHES WATER PUMPS FOR IRRIGATION IN MANGU BOKKOS FEDERAL CONSTITUENCY | ERGP554006587 | 8,000,000.00 | | | | | | | |
MOTORCYCLES FOR YOUTHS EMPOWERMENT AT DAWAKIN/TOFA/RIMIGADO/TOFA FEDERAL CONSTITUENCY, KANO STATE | ERGP554006588 | 8,000,000.00 | | | | | | | |
PROVISION OF DRAINAGE SYSTEM IN MANI TOWN, MANI LOCAL GOVT AREA, KATSINA | ERGP554006589 | 8,000,000.00 | | | | | | | |
EROSION CONTROL IN OYI/AYAMELUM FEDERAL CONSTITUENCY, ANAMBRA STATE | ERGP554006590 | 8,000,000.00 | | | | | | | |
YOUTH TRAINING ON CLIMATE CHANGE IN IKWERE/EMUOHA FEDERAL CONSTITUENCY | ERGP554006591 | 8,000,000.00 | | | | | | | |
CONSTRUCTION OF SIDE DRAINAGES AND ROAD IMPROVEMENT OF METAHO STREET, BADAGRY LGA | ERGP554006592 | 8,000,000.00 | | | | | | | |
COMPLETION OF COURT, OKEODAN AND STATION BULIDING AT OKEODAN IN EGBADO SOUTH LGA, OGUN STATE | ERGP554006593 | 8,000,000.00 | | | | | | | |
EROSION CONTROL WORKS AT ALARAMIMO STREET OFF OKO OBA ROAD, ORILE LAGOS | ERGP554006594 | 8,000,000.00 | | | | | | | |
TRAINING ON ENVIRONMENTAL HEALTH CLEANLINESS IN AMUWO ODOFIN FEDERAL CONSTITUENCY, LAGOS | ERGP554006595 | 8,000,000.00 | | | | | | | |
CONSTRUCTION OF DRAINAGE AND ROAD IMPROVEMENT WORKS ON OGOGHO ROAD AT UBEAGUALI IHIE/AMAGU ISHIAGU, EBONYI STATE | ERGP554006596 | 10,000,000.00 | | | | | | | |
COMPLETION OF MBANAGU EROSION CONTROL AT OTOLO NNEWI | ERGP19160581 | 40,000,000.00 | | | | | | | |
EROSION AND FLOOD CONTROL WORKS AT YAGBA EAST AND YAGBA WEST, KOGI STATE | ERGP20160093 | 34,000,000.00 | | | | | | | |